The Legacy Trail, Venice to Sarasota
The Legacy Trail, in Sarasota County, Florida, is a paved path of 18.5 miles from the Venice Train Depot (mile 0) to Fruitville Road in Sarasota (mile 18.5), according to the Friends of the Legacy Trail. Ridden end to end on Trazo's map it is 18.5 miles one way, about 1 hour 41 minutes of riding at 11 mph with 75 feet of climbing, 100% on the trail and 100% off busy roads, and Trazo flags 4 busy crossings without a traffic light.
For riders who are fine crossing 4 busy roads without a traffic light; not for young kids on their own. From the start to mile 8.8 Trazo flags no busy crossing, though the trail still crosses quieter streets.
Riding it end to end
It is nearly flat. All paved. Watch for 4 crossings of a busy road with no traffic light: Central Sarasota Parkway at mile 8.8, Ashton Road at mile 12.5, Wilkinson Road at mile 13.5 and South Shade Avenue at mile 17.9. Restrooms are at 11 of the 13 trailheads listed below, and water at the same ones (Sarasota County's 2026 trail brochure). OpenStreetMap also shows, along the way: a bike repair stand at mile 0.2, a bike shop at mile 0.5, restrooms at mile 6.8 and drinking water at miles 6.8 and 12.5. From June to September the normal high at the Sarasota-Bradenton airport is about 90 to 92°F (NOAA): start early in the day and carry plenty of water.
Restrooms, water and stops
- Restrooms and drinking water at 11 of the 13 trailheads listed below (Sarasota County's 2026 trail brochure)
- Bike repair at mile 0.2, on Legacy Trail
- Bike shop at mile 0.5, on Legacy Trail
- Restrooms at mile 6.8, on Legacy Trail
- Drinking water at miles 6.8 and 12.5
Street by street
- Legacy Trail18.5 mi
Busy crossings without a light
- Central Sarasota Parkway: mile 8.8, from Legacy Trail
- Ashton Road: mile 12.5, from Legacy Trail
- Wilkinson Road: mile 13.5, from Legacy Trail
- South Shade Avenue: mile 17.9, from Legacy Trail
Trailheads, from Venice to Sarasota
Sarasota County's 2026 trail brochure lists these trailheads. The brochure says parking is available at the trailheads.
- Venice Venice Train Depot: restrooms, water and a bike repair station
- Venice Patriots Park: restrooms and water
- Nokomis Nokomis Community Park: restrooms and water
- Nokomis Nokomis Riverview Park
- Laurel Laurel Park: restrooms, water and a bike repair station
- Osprey Oscar Scherer State Park: restrooms and water (entrance fee; opens at 8 a.m.; as of November 2026)
- Osprey Osprey Junction Trailhead: restrooms, water and a bike repair station
- Sarasota Legacy Trail Access, 7905 McIntosh Road (parking only)
- Sarasota Culverhouse Nature Park: restrooms and water
- Sarasota Ashton Trailhead: restrooms, water and a bike repair station
- Sarasota Sarasota Springs Trailhead: restrooms, water and a bike repair station
- Sarasota Pompano Trailhead: restrooms, water and a bike repair station
- Sarasota Payne Park: restrooms and water
Rules, bridges and crossings
It runs on a former railroad line (Sarasota County).
Sarasota County runs the trail. It is open from 6 a.m. to sunset, the speed limit is 15 mph, riders warn before passing, and riders stop and use the crossing signals at road crossings (county rules).
E-bikes are allowed if they have working pedals; other motor vehicles are not, and the 15 mph limit applies to everyone (county rules).
Markers every tenth of a mile, like "LT 12.50", tell 911 where you are (Sarasota County).
It goes over US 41 in Venice, Laurel Road, Clark Road and Bee Ridge Road on bridges, and under State Road 681. The Clark Road and Bee Ridge Road bridges opened in summer 2025 (Florida Department of Transportation, FDOT).
At other roads it crosses at traffic signals, stop signs, flashing yellow beacons, or HAWK beacons, which show drivers a red light when you push the button (Sarasota County). Trazo counts a traffic light or a HAWK as a light. A flashing yellow beacon warns drivers but shows them no red light, so Trazo still flags those crossings: stop, push the button, and cross once traffic has stopped.
The county lists a water-main project on Ashton Road near the Ashton Trailhead: the trail and trailhead stay open, and Ashton Road is down to one lane with flaggers. Check Sarasota County's Legacy Trail page for closures before you ride. As of November 2026.
What the Legacy Trail connects to
- At the Venice Train Depot it meets the Venetian Waterway Park path, about 9.3 miles of concrete path on both sides of the Intracoastal Waterway (Wikipedia).
- From Nokomis Riverview Park, about 8.5 miles of streets, with bike lanes and paths beside the road on Border and Edmondson Roads, lead east to the North Port Connector, a paved trail of about 5.5 miles (Friends of the Legacy Trail).
- At Beneva Road a separate half-mile connector, opened in March 2026, runs north to Fruitville Road east of the trail's end, and on to the city's Circus Trail (WWSB, ABC7 Sarasota).
- In October 2026 the county approved a link of about two miles toward Nathan Benderson Park, not built yet (WWSB, ABC7 Sarasota).
Rides on the Legacy Trail
Computed from OpenStreetMap with Trazo's traffic-stress rating. Busy roads: fast or multi-lane traffic with no bike lane. Guidance only; verify safety yourself.